Airworthiness Directives in respect of Aircraft/rotorcraft certified by India

Last updated 01st April 2013

 

Number

Issued by

Issue Date

Subject

Type Approval Holder

Effective Date

Revision

Pre-revised AD

001

01-07-2008

Fuselage – General – Visual inspection on fitting connecting tail boom top Shell and front spar of vertical fin

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

Nil

Not applicable

002

01-07-2008

Rotor (S) – Rotor blades – One time inspection for bolt head crack on bolt blade fork (big)

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

Nil

Not applicable

003

01-07-2008

Hydraulic Power – Main – One time check to determine the condition of hydraulic hoses connected to Tail rotor actuator and clearance between hydraulic hose and TGB fairing.

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

Nil

Not applicable

004

01-07-2008

Engine Controls – Power Control – One time inspection of collective pitch anticipator (CPA) connector, CPA cable routing and CPA installation on the helicopter.

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

Nil

Not applicable

005

01-11-2008

Landing Gear – Nose Landing Gear Assembly

National Aerospace Laboratories (NAL), Bangalore

Within 21 days after final issue date

Nil

Not applicable

006

01-11-2008

Flight Control – Deactivation of dual control

National Aerospace Laboratories (NAL), Bangalore

Within 21 days after final issue date

Nil

Not applicable

007

01-11-2008

Landing Gear – Nose Landing Gear shock absorber bracket

Fuselage – Attach/attached fittings (to Fire wall)

National Aerospace Laboratories (NAL), Bangalore

Within 21 days after final issue date

Nil

Not applicable

008

01-11-2008

Fuselage – Attach/attached fittings (to Fire wall)

Power plant – Engine mount assembly

National Aerospace Laboratories (NAL), Bangalore

Within 21 days after final issue date

Nil

Not applicable

009

02-03-2009

Rotors Flight Control – Rotor Control – marking on cyclic stick, trimming of L-angle of separator wall, provision of additional safety and modification of fork assembly

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

Nil

Not applicable

010

02-03-2009

Stabilizers – Vertical Stabilizer – Installation of web stiffener on front spar of fin torsion box assembly

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

Nil

Not applicable

011

02-03-2009

Tail Rotor – Indicating – Replacement of velocimeter model 7310 with model 8866-1

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

Nil

Not applicable

012R1

16-02-2010

Rotor Drive (S) – Gearbox (es) – One time check for presence of water in MGB lubricating oil of Dhruv helicopter IDS assembly

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

This AD revises DGCA AD 012 dated 02-03-2009. This AD revision is issued to effect the change that occurred following re-naming of  R&D Directorate as Aircraft Engineering Directorate

012

013R1

16-02-2010

Navigation – Dependent Position Determination – Design improvement in GPS antenna bracket

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

This AD revises DGCA AD 013 dated 02-03-2009. This AD revision is issued to effect the change that occurred following re-naming of  R&D Directorate as Aircraft Engineering Directorate

013

014R1

16-02-2010

Rotor (S) – Rotor blades – Ultrasonic (A-scan) inspection of main rotor blades.

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue date

This AD revises DGCA AD 014 dated 21-08-2009. This AD revision is issued to effect the change that occurred following re-naming of  R&D Directorate as Aircraft Engineering Directorate

014

015R1

16-02-2010

TAIL ROTOR DRIVE – Gearboxes – Installation of modified parts of AGB assembly to control the interfacing tolerance for avoiding low lube oil pressure

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

Within 21 days after final issue

date

This AD revises DGCA AD 015 dated 21-08-2009. This AD revision is issued to effect the change that occurred following re-naming of  R&D Directorate as Aircraft Engineering Directorate

015

016 01.04.2010 HYDRAULIC POWER – Main – Additional inspections of tail rotor actuator (TRA) flange assembly for crack. Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore. Within 21 days after final AD issue date. Nil

017R1

20.08.2010

ROTOR (S) – Rotor heads(s) – One time check on connecting rod assemblies (UCS) for crack

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

 

Within 21 days after final issue date

 

Nil

Not applicable

018

 

20.08.2010

Rotor (S) – Rotor BLADES – One time fluorescent dye penetrant CD check on bolt- blade fork (big) - MRB

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

 

Within 21 days after final issue date

 

Nil

Not applicable

019

 

20.08.2010

HYDRAULIC POWER – Main – One time check on tail rotor actuator

Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

 

Within 21 days after final issue date

 

Nil

Not applicable

020   02.11.2010 STABILIZER – Vertical stabilizer – One time check for crack on IGB rib on fin torsion box assembly & tail boom assembly AFT Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore Within 21 days after final issue date Nil Not applicable
021 09.06.2011 AIR CONDITIONING-Distribution- one time check on interference of air conditioning tube with engine oil scavenge pipe and modification for introducing improved clearance. Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore Within 21 days after final issue date Nil Not applicable
022 09.06.2011 STABILIZER – Vertical stabilizer – Reinforcement of IGB bottom rib and strengthening of IGB rib in fin torsion box assembly. Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore Within 21 days after final issue date Nil Not applicable
023 04.07.2011 Engine Controls – Power Control – Inspection of collective pitch anticipator Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore Within 21 days after final AD issue date. Nil Not applicable

 

024 02.09.2011 TAIL ROTOR DRIVE- Shafts – Check of elastomeric bush seating position on tail drive shaft assemblies (Seg.-3 & Seg.-4) in situ on the helicopter. Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

 

Within 14 days after final AD issue date. Nil Not applicable
025 27.02.2012 ROTOR(S) - Rotor head(s) - One time Torque check on Mounting Bolts of Main Rotor Blade. Rotary Wing Research & Design Centre, Hindustan Aeronautics Limited, Bangalore

 

Within 21 days after final AD issue date. Nil Not applicable
026 23.07.2012 Eye-end assembly - Installation of improved steel  eye-ends  in place of existing    titanium eye-ends  of collective, longitudinal and  lateral  connecting   rod   assemblies. Rotary Wing Research and Design Centre, Hindustan Aeronautics Limited , Bangalore.

 

Within 21 days after final AD issue date. Nil Not applicable
027 23.07.2012 Intermediate Gear Box assembly - Introduction of soft support at input side of ALH Intermediate Gear Box (IGB) assembly. Rotary Wing Research and Design Centre, Hindustan Aeronautics Limited , Bangalore.

 

Within 21 days after final AD issue date. Nil Not applicable
028 23.07.2012 FDR/CVR potentiometer attachments of  cyclic and directional channels. Rotary Wing Research and Design Centre, Hindustan Aeronautics Limited , Bangalore.

 

Fortwith Nil Not applicable
029 07.09.2012 Tail Rotor Hub 
Retention Nut.
Rotary Wing Research and Design Centre, Hindustan Aeronautics Limited , Bangalore.

 

Within 14 days from the date of issue of this AD. Nil Not applicable
030 07.09.2012 Pilot door, Co-pilot door, sliding door and clamshell door. Rotary Wing Research and Design Centre, Hindustan Aeronautics Limited , Bangalore.

 

Within 14 days from the date of issue of this AD. Nil Not applicable